NEWTON PUBLIC SCHOOLS

 

Annual Report on Systemwide Goals

2001/2002

 

 

 

The Newton Public Schools strives to meet the learning needs of all students by ensuring that the K-12 curriculum offers a coherent course of study yet remains flexible enough to allow for differentiation according to children’s needs; by recognizing the diversity that exists within the school population; and by respecting teachers’ judgment in making sound instructional decisions for the students they meet every day.  The school system’s core value of respect for human differences should permeate all of our work (see attached mission statement).  With the cooperation of all members of the school community, the system seeks to hold true to its values while it sets out to accomplish the goals specific to 2001/2002 as outlined below.

 

 

1.      To strengthen the quality of K-12 education by continuing the process of

aligning Newton’s curriculum with the state frameworks and creating an academically challenging standards-based learning environment—Curriculum revision is an ongoing process in our school system, with adjustments and improvements being implemented in content areas every year.  Still, with the advent of the Massachusetts Curriculum Frameworks, it is important for the system to document its progress and continued improvement on a coherent, logically sequenced curriculum.  The standards-based curriculum we advocate balances the ideal of individual, professional decision-making by classroom teachers with agreements among teachers about the sequencing and coherence of subject matter.

 

To achieve this goal we will:

 

Ø      Continue the review/revision process in science and fine arts.

The revision processes in science and fine arts, K-12, have been completed.  Both K-12 content areas reflect alignment to the Massachusetts Curriculum Frameworks and, most important, the alignment of curriculum between our two high schools has been implemented.  In science, new instructional materials have been purchased for grades 9 & 10, while replacement and new materials are slated to be purchased in FY03 for grades 11 & 12, especially at Newton North to bring equity to resources in those grades.  Textbooks and materials were purchased for a revised sixth grade curriculum.  The fine arts revision, though aligned, will require additional work to bring equity to the program offerings across the elementary and middle schools.

 

 

 

 

 

 

Ø      Institute a citywide approach to improving student literacy.

The affirmative vote to override Proposition 2 1/2 ensured our ability to expand our existing literacy specialist positions so that each elementary school will have a full-time teacher to address the learning needs of all our K-5 students, especially those of our most at-risk readers.  New literacy assessments have been adopted and staff training in their use has been provided for all K and

grade 1 teachers.  Teachers in grades 2-5 will be in the second year of sustained, building/classroom professional development to bring systemic continuity to literacy instruction and assessment in every school.

 

Ø      Commence planning to integrate health and physical education curricula.

The coordinators of physical education and comprehensive health have met regularly in FY02 to review the research and forge the agenda for integrating these two subjects.  For example, this year smoking prevention lessons and activities were developed and implemented into the elementary physical education curriculum.  Next year, lessons and activities on additional health topics - e.g. sun safety, nutrition, first aid, injury prevention - will be developed and piloted in elementary physical education classes, K-5.  The coordinators will continue to frame the integrated curriculum and will meet with representative teachers to continue the planning over the summer.  We anticipate a specific set of committee recommendations to be identified and explored throughout FY03.

 

Ø      Review the elementary world language program and prepare recommendations for the FY03 or FY04 budget.

The FY03 budget process eliminated the elementary world language program due to issues of fiscal sustainability of the program.  We will continue to seek alternative strategies for returning elementary world language to the curriculum. Our part-time world language coordinator will continue to work to strengthen our middle school program—providing supervision and staff development—while leading our efforts to restore the elementary program.  The world language program will begin the formal curriculum revision cycle in FY03.

 

Ø      Collect broad-based teacher input on grade level/content area expectations.

We continue to review and refine our aligned curriculum with deliberate evaluations and feedback from all classroom teachers.  The evidence of the efficacy of our curriculum is rooted in our ability to provide a targeted system of professional development to our teachers in the research-based methods and strategies to implement the curriculum across the subjects and grades.  Teachers reviewed the K-5 Benchmarks throughout FY01 and FY02.  We will bring consistency to our instruction through the process of curriculum mapping (aligning what teachers actually teach—the practiced curriculum—with the written

curriculum—Grade-level Benchmark documents)—in the summer with math and social studies curriculum.

 

Ø      Produce clearly written materials for parents regarding grade level/content area expectations in the middle schools.

Parent documents were developed and distributed at the middle schools in the fall of FY02.  Grade level Benchmark documents were distributed to middle school teachers as well. 

 

Ø      Review/revise elementary school student progress reports.

A committee of staff members initiated this projected three-year process.  We defined goals, read research reports, and recently published books that outlined best progress report practices needed for a system committed to rigorous standards-based outcomes for all students.  We plan to expand the committee to include more teachers and parent representatives, as well as program leaders, to enable more broad-based feedback from the entire Newton schools’ and parent communities to continue this work throughout FY03.

 

Ø      Provide professional development related to standards-based instruction.

Our system of professional development is differentiated for the instructional needs and goals for each level of instruction across the system.  We have provided focused workshops for large and small groups of teachers assisted by local university and national consultants, through our collaborative affiliations, and led by an emerging group of identified teacher leaders.  Most notable among these efforts has been our K-12 focus on improving literacy instruction.  Efforts to support effective implementation of curriculum through professional development are ongoing in other subject areas.

 

Ø      Communicate MCAS results and use the data to inform curriculum  revision and instructional practice.

Coordinators and building principals use MCAS results to analyze individual student achievement and to inform teaching practice.  The data received from the spring 2001 administration of MCAS was used to identify high school students, in particular, who received regular education support for MCAS remediation in preparation for the first administration of the MCAS re-test in December of 2001.  This was our initial year of regular education extended time for students in the class of 2003 and beyond who were at-risk of failure on the tests in English and mathematics.  Our preliminary analysis of the results of the re-test population suggests that our intervention for these students has been successfully implemented so that we have lowered the percentage of students in the class of 2003 at-risk of failure of the high-stakes tests. 

 

 

 

 

 

Ø      Continue technology planning, with an emphasis on integrating technology as a tool for improved teaching and learning, noting specifically the implications of the high school renovation project.

The district Technology Plan serves as a useful tool for administrators and teachers.  We have secured grant funding to scale-up our acquisition of current hardware and to provide professional development on technology integration for teachers in the elementary and middle schools.  We have scheduled large-scale training this summer for the staff at Newton South and we are supporting further training for staff at Newton North through selected coursework for revised content knowledge and curricular integration.  We have completed the wiring of North and provided telephones and Internet services to teachers in their office areas.  Newton North staff will have the opportunity to participate in our on-line teacher training while they await full renovation of their building.  We will continue to provide phased levels of training for the effective integration of technology at both high schools as our renovation schedule permits.

 

Ø      Support the system’s commitment to full inclusion of special education students through increased training for teachers and support staff.

In FY02, we focused our targeted professional development on behavior, autism spectrum disorders and strategies for reading and writing instruction.  The behavioral offerings included Crisis Prevention Intervention training for teachers, aides, and administrators. In addition, we provided behavioral management and functional behavioral assessment training for teachers, specialists, and psychologists as well as elementary school-based teams.  In keeping with appropriate pedagogy for inclusion and our systemic literacy initiative in the areas of reading and writing, we provided Project Read, writing and comprehension training, as well as Wilson I and II training.  Our challenge in this area is to provide appropriately seamless professional and curriculum development for all staff who collaborate to instruct our most fragile students.

 

2.   To develop a capital plan for meeting the needs of Newton’s school buildingsA safe and comfortable school environment is a key factor in helping staff and students do their best work.  With many of Newton’s school buildings approaching an age when major rehabilitation work may be required, it is important to put into place a thoughtful, long-range plan for renovating and maintaining the physical plant.  Collaboration between school personnel and City agencies will be essential as we build a culture of shared responsibility and develop procedures to improve the upkeep of the schools.

 

To achieve this goal we will:

 

Ø                  Work with City officials to implement the first phase of construction at Newton South High School.

We have been working with city officials to implement the first phase of construction at NSHS.  Phase 1 A, the early package to prepare the site, was completed in late summer 2001. Construction of Phase 1B, the new 80,000 square foot classroom wing, is well underway and is expected to be finished by late fall of 2002.  The new wing will be composed of two houses and house office suites; more than 30 typical classrooms; four science labs; the Family and Consumer Science Department; English department offices; History and Social Studies department offices; and SPED programs.  The school will be using the space as swing space when renovations begin to the classroom wings starting in September 2002.

 

Ø                  Complete Tier One improvements to Memorial-Spaulding.

We accomplished this goal on schedule by working with City officials, architects, contractors and school staff. This project will be completed in summer 2002 and ready for September opening.

 

Ø                  Develop a meaningful five-year capital plan that recognizes spending limitations deriving from the funding plan for the high school project.

We developed the 5-year plan in collaboration with city officials.  The plan utilized our FY02 capital allocation to respond primarily to HVAC needs. The plan will be refocused in FY03 towards continuing to improve HVAC needs system-wide as a priority.  In the remaining years, the plan will focus our capital investments in other categories under study, such as plumbing and windows.

 

Ø                  Create a comprehensive, long-range plan for renovating elementary and middle schools, driven by programmatic needs.

We place the renovation plan on hold for FY02 in order to reassess the effects of redistricting on middle school programmatic needs. We will begin the plan in FY03.

 

Ø                  Build upon recent successes to continue to improve the management and delivery of charter maintenance services.

We significantly improved the delivery of charter maintenance services, by strong fiscal management and timely service delivery.  This success was also based on development and implementation of new computerized management tools. All approved maintenance and repair work orders are now handled electronically, including financial management that is coordinated electronically with the City’s accounting department.

 

Ø                  Work with City officials to determine future utilization of the Carr Elementary School building.

We have been working with city officials to determine future utilization of the Carr School. We supported the City's decision to leave the building for FY03 and will continue discussions with the Mayor's office regarding the potential use of Carr as swing space for the high school renovation project.  Planning for this will be ongoing with the City, school department, and project team.

 

 

3.  To determine how the core value of Respect for Human Differences is incorporated into classroom practiceFor the past several years there has been some misunderstanding and resulting controversy about the ways in which Newton implements this core value in our daily practice.  While to a great extent the core value represents a set of attitudes and behaviors, it is also true that, at certain grade levels, direct instruction occurs.  This goal sets out to document what actually happens in our schools and also to point a direction for meeting future challenges.

 

To achieve this goal we will:

 

Ø      Convene the citywide faculty Human Differences Committee to lead a year-long conversation on issues related to the goal.

The citywide committee, with faculty/staff representation from all schools, met regularly to take up a variety of issues, some long-range, some more timely.  The group will continue to act as a clearinghouse for information as well as an action planning group next year.

 

Ø      Direct school-based staff/parent committees to discuss and document the learning activities that take place in each of the twenty-one schools in the areas of anti-racism, gender equity, sexual orientation, disabilities, ethnicity, etc. 

Each school has been requested to provide the Superintendent with a summary of school-based activities and opportunities to document what has been accomplished during the school year 2001-2002.  This summary is due by the end of the academic year in June 2002.  This year, an effort was geared toward K-5 instruction, so each elementary school will provide the grade level learning activities that took place during the year.  All elementary schools will use a template designed by the Burr School for consistency.  This template is organized by sub-categories under the main mission statement of Respect for Human Differences.  Each sub-category will highlight the major learning activities that took place.

 

Ø      Analyze the ways in which instruction in these areas conforms to the Massachusetts Curriculum Frameworks as well as Newton’s grade-level benchmarks.

The K-8 coordinators identified and delineated the instances in the Newton Benchmark documents where the respect for human differences core value was included across our aligned curriculum.  This document was shared with all coordinators and became the primary source document for several workshops for teachers and parents.  Evening workshops, sponsored by PTOs, provided another avenue and opportunity to share how we were realizing our commitment to respect for human differences across our curriculum. 

 

 

 

 

 

Ø      Clarify the process by which texts and other instructional materials are selected for use in the schools.

A committee comprised of teachers and administrators is drafting procedures by which texts and other instructional materials are selected for use in the classroom.  These procedures are being developed to assure that textbooks and other materials support the approved curriculum and will include a process for parents and others to follow should they have concerns about specific materials.  The committee anticipates having a final proposal to the superintendent by the end of the current year.

 

Ø   Hold one or two public hearings on the subject so that citizens may offer opinions and insights on the ways in which the core value is implemented in the schools.

     Instead of holding formal public hearings, the superintendent formed a citizen advisory group to discuss ways to help the community find common ground on the sensitive issues related to the school system's core value.  The group decided to sponsor a series of "Superintendent's Coffees," which bring together 15-20 people at a time for open, honest communication.  These meetings which began in May will continue in the next school year.

 

Ø   Support the district’s participation in the EMI Collaborative as part of a larger effort to embrace active anti-racist education.

     This year, 19 Newton faculty and staff participated in EMI training, bringing the total number of people trained in Newton to over 150.  In addition, some Newton staff became certified instructors.

 

Ø   Decide how the concepts of disability education can be included under the umbrella of Respect for Human Differences.

     At the superintendent's request, the Board of Understanding our Differences held a parent forum to discuss various ways of incorporating disability awareness education into the curriculum.  These ideas will inform future discussions at the administrative, and subsequently, at the community level.  For the time being, we will keep the UOD program intact, with no major changes being contemplated.

 

Ø   Report to the School Committee in the spring about the progress of this effort.

The report is part of the Annual Report on Systemwide Goals.

 

 

4.  To improve the system of student transportation in the Newton Public Schools—Following both the Oak Hill bus tragedy and the citywide redistricting process last year, a number of important transportation-related issues surfaced for public deliberation.  This year, we propose to take an integrated approach to resolving a number of standing questions in the area of student transportation so that the School Committee may provide a safe, effective and efficient system of transporting students to and from school as well as to destinations outside city limits.

 

To achieve this goal we will:

 

Ø      Review and revise, as necessary, the citywide out-of-state field trip policy, including the use of chaperones.

The citywide Field Trip Policy has been rewritten to provide a clear and consistent statement of the purpose of school trips, the procedures for planning trips, and explicit rules governing transportation for all trips including day trips, extended or overnight trips, and international trips.  The policy and all consent forms have been reviewed and rewritten where necessary by the City Law Department.  The policy is currently in final form and will be presented to the School Committee for a vote of approval on June 10, 2002.

 

Ø      Study the research on the use of seat belts on school buses and determine the extent to which safety belts will be used in Newton.

The use of seat belts on school buses was researched and reviewed in detail during the fall of 2001.  The School Committee held several public discussions on the pros and cons of using lap belts on school buses.  The research included a variety of sources including government reports, transportation studies, medical reports, newspaper articles, and individual statements.  The School Committee voted to accept the recommendation to require factory installed seat (lap) belts on all buses beginning with school year 2002-2003.

 

Ø      Develop consistent procedures, practices and contracts for utilizing outside bus companies.

The new Field Trip Policy calls for the use of the school system’s Office of Transportation as the source of information and arrangements for school trips.  A new bid for motor coach services has been drafted which will provide the system with a list of between two and four recommended contractors for travel by motor coach when yellow school buses are not appropriate.  The Office of Transportation will provide written instructions to all staff as to the procurement of bus services.

 

Ø      Analyze current busing policy and decide upon acceptable walking distances for students.

The School Committee received a report showing the numbers of students being bused under the current policy and mileage limits for walking and riding.  The School Committee has retained the current walking distances and riding eligibility.

 

 

 

 

 

Ø      Analyze effects of a possible fee structure for school transportation services.

The School Committee received a report on user fees for busing which includes the financial impact of instituting fees of $180 per student per year.  No fees have been implemented at this time.

 

Ø      Ensure the transportation system supports equitable educational opportunities for all secondary school students.

After the redistricting decisions were made in the spring of 2001, we undertook a review of services provided at all secondary schools. Based on the review of before and after school activities and transportation options for students, we have proposed a plan to add a bus to accommodate the students at South who travel from the Williams district so that they will have equal access to all school programs.  This bus service will begin in September 2002.

 

Ø      Use the above policy decisions to inform the bid process for securing new transportation contracts with busing companies.

The seat belt policy decision and all other safety reviews were fully incorporated into the bid for school bus transportation services beginning in July 2002.  The bid process was carried out in full collaboration between the school business, purchasing and transportation offices, the METCO program, and the City purchasing office.  Proper procedures were followed to allow the Board of Aldermen to vote to permit a five year contract option.  The bid process drew two qualified bidders, and the process concluded with the School Committee’s vote to award the bid to Eastern Bus Company, the lowest responsive and responsible bidder.  The bid incorporated the seat belt requirement and a new fleet of buses equipped with belts will be ready for the opening of school in September 2002

 

 

5.  To improve the management systems of the School Department—In order to deliver educational programs in the most effective way, it is critical for the School Department to make certain that various management systems provide a solid foundation for decision-making.  Improved practice is required in financial management, operations, and data management, in particular.

 

To achieve this goal we will:

 

Ø         Develop and implement a comprehensive financial management improvement plan, designed to give timely notice of potential budget deficits and to provide ongoing, systematic oversight of all school  spending.

The comprehensive management improvement plan with its ten guidelines has been fully implemented.  During the past year, there has been more timely reporting from all administrative departments, more accurate and timely financial data, and a number of efficiencies.  These range from lower labor hours used in the school lunch program, greater use of the Pentamation system which eliminates duplicate tracking of costs and personnel, the computerized M&R system, and improvements to the payroll operation and in collection and management of the Use of School Buildings funds.

 

Monthly budget updates have provided clear and consistent financial information.  Each monthly projection has shown a small surplus indicating that the school budget is being closely managed and expenses are within the planned budget.  New Human Resource reports and procedures provided close tracking of staff, staff reconciliation reports, and adherence to budget.  A final staff reconciliation report shows that all staffing is within budget this year.  New reports were used for the development of the FY03 budget with all staff accounted for by individual salaries and account codes. Special Education budget updates are provided monthly to Central Staff and School Committee with data for student enrollment, aides staff, tuition and transportation costs. Monthly Operations reports include utility, charter maintenance, and overtime updates as well as the status of major projects in the school buildings.  This information has been incorporated into the monthly budget updates.

 

Use of the Pentamation Accounting System has increased and improved, resulting in a better alignment of costs and expenditures within the detailed school budget.  New budget categories have been developed to provide clear distinction between programs and job categories.  The FY03 budget has been prepared using Pentamation accounts as well as the school responsibility format.  This proved to be challenging when matching to previous years but will provide improved cost data in future years.  Improved tracking of health insurance and benefits costs through collaboration with City officials and new monthly tracking procedures have provided improved budget management and control of this costly area.

 

Payrolls continue to be accurate and on time; this is evidenced by the lack of manual check requests that had previously been a problem.  This improvement is attributed to the management of the school payroll process by the Payroll Supervisor, collaboration with City departments, and more accurate Human Resource data as indicated above.  The annual outside audits of the End of Year Report to DOE for FY00 and FY01produced no findings-or a “perfect” score.

 

Ø      Make better use of existing and new technology for state reporting and systems management purposes.

There have been improvements in the use of technology for reporting including successful transmission to the Department of Education of the required 400,000 student data elements, the well planned transition to Open District, the new student data system (to begin in September 2002) and the addition of new Special Education management software (EasyIEP) to track student education plans.  The Ed Center and school office staff has improved in the use of spreadsheets, the use of Pentamation and a number of other electronic reporting tools. Complex MCAS data analysis has been provided to all schools using new software and there is an updated spreadsheet model for enrollment forecasting with full documentation for future use.

 

Ø      Review the existing food services program and recommend changes if necessary.

      We hired a new Food Services Director who has worked with the Newton Public Schools and Chartwells to increase sales by 1.2 %.  Reimbursement dollars from the government are up 7.1%; food costs are reduced by 3.8%, and overtime labor costs have also been reduced.

 

Ø      Develop an effective and efficient system for providing custodial services to the schools, including the use of overtime.

      We reduced the use of overtime and have increased custodial rates for activities that use school buildings after regular school hours.  We have met our FY02 goals for collection of these user-funded rates, and these funds have been credited to the custodial account.

 

Ø      Collaborate with the City Building Department to institute a well-planned delivery system for charter maintenance services.

      We collaborated extensively with the City building department and other departments and improved delivery of charter maintenance services.  The City building and school operations staff are utilizing the new computer tools to review, prioritized, approved and provide cost estimates for all maintenance and repair requests.  We provided joint training to staff of both departments and written training materials.

 

Ø      Explore best practices from other school districts and private organizations and apply these where possible in Newton.

This year we have researched, and in some cases, utilized outside contractors (specialists) for specific repairs when we found them to be more cost effective.  We have also implemented waste management efficiencies from a school system on the south shore and have explored other communities within the area to model our Integrated Pest Management program.